Product & venture builder

We build products. Some become companies.

Facilia is a product company that builds its own ventures and partners with ambitious teams to turn ideas into products, businesses and technology that scales.

Ventures

Things we're building.

Products of our own, some operating, some just getting started.

Monitor

Industrial · Predictive Maintenance

Building

AI-powered predictive maintenance systems that help industrial companies prevent failures, reduce downtime and extend asset life.

Coming soon
Combo

Experiences · AI Planning

Building

An agentic platform for planning unforgettable group experiences.

Coming soon
Clinck

Advertising · Print Production

Building

The operating system for advertising and graphic-production companies.

Coming soon
Muevo

Electric Mobility · Marketplace

Exploring

A vertical platform for Colombia's electric mobility market, an EV marketplace built on intelligence around the vehicle: valuation, residual value, battery health and cost of ownership, so buying a used EV stops feeling like a bet.

Coming soon

What we do

We don't just build software. We build things that can become businesses.

01Build

We find problems worth solving and create products around them.

02Partner

We work with people who know a market, customer or problem deeply, and turn that insight into a product.

03CTO

We provide product and technical leadership for companies that need to build, launch or scale technology.

Built with partners

And things we've built with others.

Products we've designed and shipped alongside founders and teams.

Brizzo
Brizzo
Lumen
Lumen
Mantix
Mantix
Pixel Dev
Pixel Dev
Brizzo
Brizzo
Lumen
Lumen
Mantix
Mantix
Pixel Dev
Pixel Dev

Partner

Have something worth building?

We partner with founders, operators and companies that have a problem worth solving, an idea worth testing or a product worth scaling.

01

Product

We help turn an idea into a clear product.

02

Engineering

We design and build the technology.

03

CTO

We provide technical and product leadership.

04

Venture

We explore building something together for the long term.

Sometimes we build our own company. Sometimes we build yours with you. Sometimes we become the team responsible for making technology happen.

How we build

A product-building loop.

01

Find

Find problems worth solving.

02

Test

Validate before overbuilding.

03

Build

Prototype and ship.

04

Launch

Put it in the hands of real users.

05

Scale

Double down on what works.

The build system

Humans and specialized agents, on the same team.

We're building the system that builds software. Experienced builders set the direction, make the key architectural decisions, and hold the standard. Specialized agents, one for each job, rather than one generalist trying to do everything, execute the work at scale. Every project runs on specs, evals, and telemetry, and you have full visibility into all of it.

Woman Holding a Balance, Johannes Vermeer, c. 1664
Woman Holding a Balance, Johannes Vermeer, c. 1664

Humans own

Direction, architecture, trade-offs, judgment and the bar the work has to clear.

La fragua (The Forge), Francisco de Goya, c. 1815–1820
La fragua (The Forge), Francisco de Goya, c. 1815–1820

Agents own

Scale and repetition: research, first drafts, implementation, tests, review passes and documentation.

Specs

Work starts written. We resolve ambiguity before anyone writes code.

Evals

Output is measured against defined criteria before it ships. If it doesn't pass, it doesn't ship.

Telemetry

The work is instrumented: what was built, what changed, how long it took. Measurable, not anecdotal.

Access

You follow the process the whole way, not just the deliverable at the end.

Why Facilia

We build from the inside.

Builders, not vendors

We care about the product, not just the deliverable.

Product + engineering

We don't separate deciding what to build from building it.

AI-native

Modern AI tooling increases the leverage of small, senior teams.

Ownership

We build our own products, so we know the difference between shipping software and building a business.

Long-term

The best partnerships don't end at launch.

About

Facilia is a product company based in Latin America. We build products of our own and partner with ambitious teams to build theirs. Our ambition is a portfolio of useful products, plus the experience, infrastructure and talent to build the next one faster.

Let's build something worth building.